フロータイムと遅延ペナルティを考慮した保守スケジューリングのコスト最小化

Minimizing Maintenance Cost Involving Flow-time and Tardiness Penalty with Unequal Release Dates

シェア:XThreadsFacebookLINEはてブBluesky

リリース日が異なるタスクのフロータイムと遅延の和を最小化する局所最適則を証明し、O(n^3)のスケジューリングアルゴリズムと並列プロセッサ向けリアルタイム手法を提案して予防保守計画に適用した論文。

著者: K. Adjallah, K. Adzakpa

分類: cs.PF, cs.RO

原文アブストラクト

This paper proposes important and useful results relating to the minimization of the sum of the flow-time and the tardiness of tasks or jobs with unequal release dates (occurrence date), with application to maintenance planning and scheduling. Firstly, the policy of real-time maintenance is defined for minimizing the cost of tardiness and critical states. The required local optimality rule (FTR) is proved, in order to minimize the sum or the linear combination of the tasks' flow-time and tardiness costs. This rule has served to design a scheduling algorithm, with O(n 3) complexity when it is applied to schedule a set of n tasks on one processor. To evaluate its performance, the results are compared to a lower bound that is provided, in a numerical case study. Using this algorithm in combination with the tasks urgency criterion, a real-time algorithm is developed to schedule the tasks on q parallel processors. This latter algorithm is finally applied to schedule and assign preventive maintenance tasks to processors in the case of a distributed system. Its efficiency enables, as shown in the numerical example, to minimize the cost of preventive maintenance tasks, expressed as the sum of the tasks tardiness and flow-time. This corresponds to costs of critical states and of tardiness of preventive maintenance.

関連論文

  1. 1Boston Dynamics、車輪付きAtlasの研究試作機を紹介研究・技術
  2. 2GXOとApptronik、Apolloの物流現場試験を拡大 最大1,000台の展開を構想量産・展開
  3. 3NVIDIA、CoRLでGR00T 2とIsaac Lab 3.0を発表新製品・発表
  4. 4newmoとKDDIが資本業務提携 2028年に堺市で自動運転タクシー商用化目指す提携・買収
  5. 5UC BerkeleyとNVIDIAの研究者、AIエージェントでロボット制御コードを仮想環境で改善研究・技術
PR本紙発行元 EmplifAI